Energy · 1.6

Nuclear Power

Quantified news impact based on deduplicated, quality-reviewed events in a single 60-day window.

Average net impact+30weighted per event
Average gross impact36absolute weighted average
Events11same period
Confidence85%model average
Raw intensity64before weighting
Previous period0net impact
Gross changeInsufficient base
Diffusion speed0.2 / day
Concentration12%
Direction disagreement15%
Source independence93%15 sources
IMPACT TREND

60-day effective impact

Positive 8 · Negative 3 · Mixed 0

Current periodPrevious period
TIME HORIZON

Impact duration

Immediate3%10 cumulative effective impact
Short term26%103 cumulative effective impact
Medium term48%189 cumulative effective impact
Long term23%88 cumulative effective impact
CO-IMPACT

Related industries

EVENT EVIDENCE

Events ranked by effective impact

Page 2 of 2 · 11 events

Macro0

No evidence on this page.

Industries1
01
Industriesnegative

Kansai Electric Explains Reprocessing Plant Delay Will Not Affect Nuclear Fuel Removal Plans, Will Adjust Dry

Kansai Electric Power Co. told Fukui Prefecture officials on March 27 that the delay of the Rokkasho Reprocessing Plant will not affect its plan to remove spent nuclear fuel from three local reactors. The plant has been postponed 27 times since construction began in 1993. The company will reconsider the start date of a planned dry storage facility originally set for 2026, as the prefecture has withheld a decision on its construction pending the reprocessing plant's status.

Effective
-8
Intensity
40
Confidence
80%
Horizon
Long term
Companies0

No evidence on this page.