NARI Completes Single-Track Migration of Xinjiang Power Data Collection System
On September 6, NARI Technology completed the single-track cutover of the security architecture upgrade for Xinjiang's power consumption data collection system, relocating the entire collection system into the load production control zone and bringing it into stable operation. With this milestone, Xinjiang Power Grid became the first provincial grid within the State Grid Corporation of China system to complete the security architecture upgrade for its collection system. This also marks the first single-track deployment of a collection system based on a security protection architecture within State Grid's network.