CompaniesOther

Shaanxi Construction Unit Wins RMB 1.05 Billion EPC Contract for 200MW/800MWh Storage Project

Published: Updated: By 24TopNews Editorial Desk

Shaanxi Construction Engineering Group announced on September 17 that in August 2026 its subsidiary Shaanxi Construction Engineering First Construction Group won the EPC general contract for the Bazhou Jiaxu Times 200MW/800MWh grid-forming independent energy storage station project.

The project is located in Korla, Bayingolin Mongol Autonomous Prefecture, Xinjiang Uygur Autonomous Region, and carries a contract value of RMB 1.05 billion. It is a grid-forming independent energy storage station with a construction scale of 200MW/800MWh.

The company said the project is currently at the bid-winning stage.

24TOPNEWS IMPACT INTELLIGENCE

Why this event matters

The event has a measured impact on 2 industrys. The strongest current signal is positive for Batteries & Energy Storage, with intensity 60/100 and 70% confidence over a short term horizon.

Energy · 1.14

Batteries & Energy Storage

Direction
positive
Intensity
60
Confidence
70%
Horizon
Short term
Effective impact +23
Construction & Real Estate · 7.5

Industrial Construction

Direction
positive
Intensity
50
Confidence
65%
Horizon
Short term
Effective impact +18

Impact figures are analytical estimates that combine direction, intensity, confidence and event importance. They are not investment advice.